Dynamic test of the Les Cèdres footbridge structure, Lausanne, Switzerland
A dynamic test of the Les Cèdres footbridge has recently been carried out with the double goal of corroborating that the real structure behaves according
A dynamic test of the Les Cèdres footbridge has recently been carried out with the double goal of corroborating that the real structure behaves according
This summer, the execution of the main structure and the finish floor of the Les Cèdres bicycle and pedestrian footbridge in Chavannes-près-Renens (Switzerland) was completed.
A few days ago, we participated in the conference that the General Directorate of Roads of the Ministry of Transport and Sustainable Mobility (Ministerio de
We are wating you at the conference about THE PROJECT WITH EUROCODIGES IN THE STATE ROAD NETWORK Next Thursday morning, May 23rd, The Professional Association
Last week the type tests of the seismic isolators for the railway bridge at Biobio river in Chile were carried out. This bridge is being
Last Wednesday, the first longitudinal truss supporting the new floating volume of the Bilbao Fine Arts Museum was raised and placed. The maneuver took less