Dynamic test of the Les Cèdres footbridge structure, Lausanne, Switzerland
A dynamic test of the Les Cèdres footbridge has recently been carried out with the double goal of corroborating that the real structure behaves according
A dynamic test of the Les Cèdres footbridge has recently been carried out with the double goal of corroborating that the real structure behaves according
This summer, the execution of the main structure and the finish floor of the Les Cèdres bicycle and pedestrian footbridge in Chavannes-près-Renens (Switzerland) was completed.
A few days ago, we participated in the conference that the General Directorate of Roads of the Ministry of Transport and Sustainable Mobility (Ministerio de
We are wating you at the conference about THE PROJECT WITH EUROCODIGES IN THE STATE ROAD NETWORK Next Thursday morning, May 23rd, The Professional Association